Donegal County Council Logo
Home > Services > Roads Service > Roads Service Public Consultation > Carrigart to Downings Footpath/Cycleway

Public Consultation Carrigart to Downings Footpath/Cycleway

 

It is proposed to construct a combined footpath and cycleway adjacent to the R248 on the Carrigart to Downings regional road. This is planned to extend along the western margin of the R248, from its beginning near Carrigart to its junction with a minor road close to the Rosepenna Hotel and Golf Resort in Downings. This represents a total distance of approximately 2.6Km. For much of its length, the combined footpath/cycleway is proposed to be 3m in width and will occupy the existing roadside verge. At the southern end of the site, the verge is replaced by a strip of hardstand and in this location it is proposed to create a shared pathway which is approximately 2m in width so as to fit within this area. The works will involve traffic management, excavation, kerb laying, concrete works, backfilling and any associated accommodation works.


A Natura Impact Statement has been prepared in respect of the proposed development. An Bord Pleanála may give approval to the application for development with or without conditions or may refuse the application for development.

 

The Natura Impact Statement documents can be downloaded below:

NIS Public Consultation Document - R248 Carrigart to Downings

Carrigart to Downings Cyclepath NIS

Carrigart to Downings Drawings

 

 

Subsequent to correspondence received from An Bord Pleanála and in accordance with Section 177AE(5)(d) of the Planning and Development Act, 2000, as amended, requires Donegal County Council to publish additional information in relation to the scheme.

 

The additional information, which will be in the form of an Addendum to the Natura Impact Statement, can be inspected free of charge or purchased at a fee not exceeding the reasonable cost of making a copy at the front desk of Milford PSC, Main Street, Milford or at the front desk of Letterkenny PSC, Neil T Blaney Road, Letterkenny.

 

The additional information may be inspected between the hours of 9:00am – 12.30pm and 1.00pm - 4:30 p.m. from Wednesday 23rd October 2019 to Friday 15th November 2019.

 

Submission and observations with respect to the proposed development dealing with:

  1. The implications of the proposed development for proper planning and sustainable development in the area concerned,
  2. The likely effects on the environment of the proposed development,
  3. The likely significant effects of the proposed development on a European site, if carried out.

can be made free of charge to the board at An Bord Pleanala, 64 Marlborough Street, Dublin 1 before 4:30pm on the 15th November 2019.

 

The Additional Information Addendums can be downloaded below:
Addendum I
Addendum II
Addendum III

 

Carrigart to Downings Footpath cycleway Additional Information Notice

Rate this Page

Select an option below

Map Services

Map Portal

  • winterweather Image
  • NWGreenway network icon
  • Donegal Tourism Logo
  • Rennet Image
  • NPPR Logo
  • Donegal Gathering Logo
  • Donegal Diaspora Logo
  • Public Art logo
  • Regional Cultural Centre logo
  • Spaceial logo
  • IrishWater
  • LEO