Donegal County Council proposes to seek the approval of An Bord Pleanála for proposed dredging of material for flood relief works along the River Finn in the townlands of Ballybofey and Stranorlar.


PROPOSED WORK

 

Dredging of material for flood relief works along the River Finn in Ballybofey & Stranorlar.

 

Local Roads Ofice For Viewing Plans

 

The Base Enterprise Centre, Railway Road, Stranorlar & Road Design Office Lifford.

 

Description and Extents

 

The proposed works are located in the Townlands of Ballybofey & Stranorlar. There are 3 locations from which the removal of silt, gravel and boulders is proposed by dredging. These are located within the River Finn SAC upstream and downstream of the main Ballybofey/Stranorlar bridge along the N15 road. Location 1 is the removal of gravels behind Jacksons Hotel, location 2 is located under the main Ballybofey/Stranorlar Bridge where the removal of silt deposits is proposed and the third location is the removal of boulders and some rubble under the Dreenan bridge within the River Finn.

 


A Natura Impact Statement has been prepared in respect of the proposed development. An Bord Pleanála may give approval to the application for development with or without conditions or may refuse the application for development.

 

The Natura Impact Statement documents can be downloaded below:

 

River Finn Dredging Natura Impact Statement Report May 2019

 

River Finn Dredging Public Consultation Document Instream Works

 

River Finn Dredging Public Consultation Drawings

 

River Finn Dredging Instream Works EIA Pre-Screen

 


The Natura Impact Statement can also be inspected free of charge or purchased at a fee not exceeding the reasonable cost of making a copy at the front desk of The Base Enterprise Centre, Railway Road, Stranorlar, or at the front desk of the Road Design Office, County House Liford. The Natura Impact Statement may be inspected between the hours of 9:00am – 12.30pm and 1.00pm – 4:30pm from Friday 07th June 2019 to Friday 19th July 2019.

 


Submission and observations with respect to the proposed development dealing with:
(i) The implications of the proposed development for proper planning and sustainable development in the area concerned;
(ii) The likely efects on the environment of the proposed development;
(iii) The likely significant efects of the proposed development on a European site, if carried out;
can be made free of charge to the board at An Bord Pleanala, 64 Marlborough Street, Dublin 1 before 4:30pm on Friday 19th July 2019.

 


Note that in accordance with Article 120(1)(b)(i) of the Planning and Development Regulations 2001 (as amended) Donegal County Council has concluded, based on a preliminary examination of the nature, size and location of the development, that an Environmental Impact Assessment (EIA) is not required.

 

 

River Finn Dredging Instream Works Notice

Rate this Page

Select an option below

Map Services

Map Portal

  • winterweather Image
  • NWGreenway network icon
  • Donegal Tourism Logo
  • Rennet Image
  • NPPR Logo
  • Donegal Gathering Logo
  • Donegal Diaspora Logo
  • Public Art logo
  • Regional Cultural Centre logo
  • Spaceial logo
  • IrishWater
  • LEO